皇冠体育apiwww.hg9988.vip)是一个开放皇冠网址即时比分、皇冠网址代理最新登录线路、皇冠网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载、皇冠体育api接入的官方平台。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠开户平台www.hg9988.vip)是皇冠官方开户平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。 欧博ALLbet官网声明:该文看法仅代表作者自己,与本平台无关。转载请注明:皇冠体育api(www.hg9988.vip):Fukushima debris removal delayed by another year
发布评论

分享到:

U8hash官网:2,636 new Covid cases, 11 deaths
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。